|
|
|
PLANNING
|
|
|
|
|
Element to be protected
|
positioning study
|
element protected
|
Installation planning is formed by the following phases:
1. In the first place, an evaluation of photo studies and elements
provided by the Client enclosed to the offer request. This is to know
if we have enough elements to perform a complete installation study
and then, a clear and essential offer. If elements are not enough,
then we will need to ask the Client for further drawings and information,
or do that by ourselves when possible, by ways of an "in situ"
inspection and observation of all elements we consider indispensable.
2. Detailed study of the installation so as to determine all the
necessary active lines to guarantee an integral electrostatic system,
the main interconnections roaming and the feeding circuit of electrostatic
impulses from the generator of impulses.
The project is aimed at precisely determining the following elements:
- a) Installation` s general physiognomy.
- b) detailed description o all architectural elements on which we
pretend to install the protective electrostatic lines. This description
will be the same as indicated in the offer, and the same to be followed
by our operators during the installation phase.
- c) Determination of the elementary lines composing each of the aforementioned
electrostatic lines.
This element is essential for a detailed description of the system
structure to be applied, and as a project to be followed by our installers.
- d)The position relative to the installation of impulses generators
and the roaming of the electrostatic line between generators and installation,
will be mainly defined in the phase of technical agreements after
the order acquisition between the responsibles for the Client and
our Technicians.
- e) The definition of executive mini- details - very much related
to the shape of architectural elements -, has to be put in the hands
of our experienced specialized operator who is in charge of putting
our project into practice in the place, with the necessary capacity
and experience.
- f) The installation is carefully controlled sector by sector, weld
by weld, and then it is successively tested in every sector and then
as a whole, to verify its correct functioning. The tension test is
also performed in this phase, by putting the system under tension
peaks of 15.000 volts for hours, in order to find out the capacity
of preserving the isolation between the conductors and in relation
to the mass.
- g) Once the installation is ready, tested and approved, the technical
staff continues with both, the general and the detailed projects,
so that every information acquired during the executive phase are
filled in forming a technical file; plus all other information of
the installations tests, the topographic drawing with the generators
location, and the distribution of probable electrostatic circuits
which are separate and sectional.
The aforementioned technical file is sent to the Client as a documentation
relative to the electrostatic installation performed.
|
|